The BCUA C-210-A project involves constructing a new pump station and decommissioning the Edgewater Water Pollution Control Facility (WPCF), redirecting flow to the Little Ferry WPCF.
Conti will restore and enhance the resiliency of the Little Ferry Water Pollution Control Facility by upgrading its power supply and plant-wide infrastructure, implementing flood mitigation measures, and protecting critical systems from future flooding to ensure the continuous and reliable operation of the wastewater treatment facility. Conti will perform the restoration and flood mitigation of the power supply and plant-wide systems throughout the Little Ferry Water Pollution Control Facility.
The work includes installing flood walls and flood barriers, dry floodproofing wall openings, sealing pipe penetrations, raising and replacing existing electrical equipment, and replacing mechanical equipment with submersible equipment better suited for future flooding conditions. The project encompasses improvements to the Main Pump Buildings Nos. 1 and 2, Primary Sludge Pumping Stations Nos. 1–4, Grit Building, Secondary Sludge Pumping Stations Nos. 1–4, Dewatering Building, Sludge Storage Building, Control Building, Administrative Building, Pipe Galleries, and Lagoon Pumping Station.
Bergen County Utilities Authority