Project provides complete civil infrastructure improvements for the first phase of the JRCA Bayfront Redevelopment Program.
When complete, the project will enable the transformation of a former industrial site into a resilient, mixed-use, mixed-income community. Construction of roadways, underground utilities, stormwater management systems, streetscapes, and supporting public infrastructure will provide access to the sprawling redevelopment.
The project generally consists of: excavation and grading, including a ground improvement scope that consists of rigid column inclusions and a load transfer platform; installation of sanitary sewer; stormwater system installation including outfall and bulkhead reconstruction and construction of stormwater treatment systems; installation of water main utilities; installation of underground electric including electric ductbanks and street lighting; construction of final roadways including concrete curb, concrete and paver sidewalks, asphalt roadways, and final striping; erosion control measures including turbidity curtains; final landscaping, bio-retention basins, and streetscapes.
Jersey City Redevelopment Agency