Markets / Road & Bridge

Barnwell Road Improvement

Location:
North Carolina
Value:
$14M
Status:
In Progress

The Barwell Road Improvement Project is a three-quarter-mile roadway widening and realignment effort that will enhance safety, mobility, and infrastructure in Southeast Raleigh. The project includes the realignment of Pearl Road, creating a new, signalized intersection to improve traffic flow. Roadway improvements feature widening with a two-way left-turn lane, grading that requires approximately 24,000 cubic yards of borrow material, and the installation of new pedestrian and bicycle facilities, including a 10-foot multi-use path on one side of the corridor and a 6-foot sidewalk on the other.

Utility and infrastructure upgrades are a major component, with the installation of 4,000 linear feet of 12-inch ductile iron waterline, twin 42-inch bores, and 6,000 linear feet of storm drain supported by 80 precast structures. In addition, curb and gutter improvements will strengthen stormwater management. Conti will perform all construction activities while traffic is maintained in both directions throughout the process.

Client:

City of Raleigh


Scope of Work:

Earthwork

Road realignment

Storm sewer +  drainage structures

New traffic signal installation

Construction of walking/bike path

New sidewalks and curbs

Water and Utility installation

Storm Drain pipe

Installation of Stormwater structures

Grading

 

More Road & Bridge Projects